click for homepage




Minutes of other Meetings
November 17, 2008
November 3, 2008
October 20, 2008
October 6, 2008
September 29, 2008
September 15, 2008
September 15, 2008
September 2, 2008
August 18, 2008
August 4, 2008
July 21, 2008
July 21, 2008
July 7, 2008
June 16, 2008
June 2, 2008
June 2, 2008
May 19, 2008
May 14, 2008
May 5, 2008
April 21, 2008
April 9, 2008
April 7, 2008
April 2, 2008
March 26, 2008
March 18, 2008
March 17, 2008
March 3, 2008
February 19, 2008
February 4, 2008
January 31, 2008
January 22, 2008
January 7, 2008
December 17, 2007
December 12, 2007
December 3, 2007
December 1, 2007
November 19, 2007
November 5, 2007
October 15, 2007
October 10, 2007
October 1, 2007
September 17, 2007
September 4, 2007
August 29, 2007
August 6, 2007
August 1, 2007
July 23, 2007
July 2, 2007
June 18, 2007
June 4, 2007
May 21, 2007
May 9, 2007
May 7, 2007
April 25, 2007
April 16, 2007
April 11, 2007
April 4, 2007
April 2, 2007
March 28, 2007
March 19, 2007
March 14, 2007
March 5, 2007
March 5, 2007
February 20, 2007
February 13, 2007
February 5, 2007
January 22, 2007
January 19, 2007
January 16, 2007
January 3, 2007
December 19, 2006
December 18, 2006
December 4, 2006
November 27, 2006
November 20, 2006
November 8, 2006
November 6, 2006
October 31, 2006
October 16, 2006
October 2, 2006
September 25, 2006
September 18, 2006
September 5, 2006
August 28, 2006
August 1, 2006
July 5, 2006
June 19, 2006
June 5, 2006
May 15, 2006
May 1, 2006
April 17, 2006
April 3, 2006
March 20, 2006
March 6, 2006
February 21, 2006
February 6, 2006
January 17, 2006
January 3, 2006
December 19, 2005
December 5, 2005
November 21, 2005
November 7, 2005
October 17, 2005
October 3, 2005
September 19, 2005
September 6, 2005
August 1, 2005
July 5, 2005
June 20, 2005
June 6, 2005
May 16, 2005
May 2, 2005
April 18, 2005
April 4, 2005
March 23, 2005
March 21, 2005
March 7, 2005
February 23, 2005
February 22, 2005
February 07, 2005
January 18, 2005
January 3, 2005

Minutes of the Board of Supervisors
MARCH 5, 2007
3:00 P.M.



Board Present: *Willie L. Gentry, Jr., Willie L. Harper, Richard A. Havasy, *Allen B. Jennings, Eric F. Purcell and Jack T. Wright

*Willie L. Gentry, Jr. arrived at 3:03 p.m.; and Allen B. Jennings arrived at 3:04 p.m.
Board Absent: Fitzgerald A. Barnes
Others Present: C. Lee Lintecum, County Administrator; Ernie McLeod, Deputy County Administrator; Kevin Linhares, Director of Facilities Management; Bob Hardy, Director of Information Technology; Amanda Lloyd, Office Manager and April Jacobs, Deputy Clerk

CALL TO ORDER

On motion of Mr. Havasy, seconded by Mr. Purcell, which carried a vote of 6-0, the Board voted to reconvene the meeting.

Chairman Wright called the March 5, 2007 meeting of the Louisa County Board of Supervisors to order at 3:00 p.m.  Mr. Havasy led the invocation, followed by the Pledge of Allegiance.

Mr. Gentry arrived at 3:03 p.m.

Mr. Jennings arrived at 3:04 p.m.

DISCUSSION OF THE NEW ELEMENTARY SCHOOL

Kevin Linhares, Director of Facilities Management, said seven elementary schools were used in the following analysis and includes projects bid or awarded since September 2006.  Mr. Linhares noted all information has been confirmed and verified with either the County or Architect for the project.  Mr. Linhares stated the average building cost is $14,145,785.00 and the average square foot building cost is $154.00.  Mr. Linhares further stated that according to the Virginia Department of Education, Division of Support Services, when comparing 2006 cost figures with 2005, construction prices have risen, however, it appears that the rapid rise in construction cost increase has moderated to a more normal rate of inflation.  

Mr. Linhares said the actual “building cost” for the elementary schools analyzed in this presentation include the following:

  • All trade cost
  • General conditions
  • Insurance
  • Inspections and testing during the construction phase
  • Kitchen equipment
  • Telephone/data cabling and terminations
  • Security cabling and terminations
  • Audio/visual equipment and installations

Mr. Linhares added the determination of actual building and square foot costs has been verified and compiled from information received from Virginia Department of Education, Hanover County Schools, Loudoun County Schools, Prince William County Schools, Spotsylvania County Schools, Caroline County Schools, Moseley Architects Harrisonburg Office, Moseley Architects Richmond Office, BCWH Architects Richmond Office, and Branch Associates.

Mr. Linhares referenced a graph showing surrounding countys elementary schools building costs compared to the average cost.  Mr. Linhares explained the total building costs for each school.  Mr. Linhares said the average building costs for the elementary schools is $14,145,785.71 and the new elementary school building costs for Louisa County is $16,443,626.00.  

Mr. Linhares referenced a graph showing the elementary schools square foot building costs.  Mr. Linhares explained the total cost per square foot for each school.  Mr. Linhares stated the average costs are $154.21 for 91,891 square foot and Louisa Countys costs is $
180.88 per square foot for 90,907 square foot.  

Mr. Linhares referenced a series of floor plans for the surrounding countys elementary schools explaining their total square footage, building cost and building cost per square foot.

The following is a summary of building costs for the above information:

  • Loudon County New Arcola Elementary School
    • Building costs $13,289,000
    • Square footage 90,050 sq. ft.
    • Building costs per square foot $147.57
  • Loudon County Sycolin Creek Elementary School
    • Building costs $12,810,000
    • Square footage 79,468 sq. ft.
    • Building costs per square foot $161.19
  • Hanover County 08 New Elementary School
    • Building costs $13,600,000
    • Square footage 90,448
    • Building costs per square foot $150.36
  • Prince William County Brightwood Elementary School
    • Building costs $14,450,000
    • Square footage 97,000 sq. ft.
    • Building costs per square foot $149.50
  • Loudon County Rosa Lee Elementary School
    • Building costs $14,450,000
    • Square footage 90,050 sq. ft.
    • Building costs per square foot $160.46
  • Spotsylvania County Massaponax Elementary School
    • Building costs $16,000,000
    • Square footage 94,919 sq. ft.
    • Building costs per square foot $168.56
  • Caroline County Ladysmith Elementary School
    • Building costs $14,370,000
    • Square footage 101,300 sq. ft.
    • Building costs per square foot $141.85
  • Louisa County New Elementary School
    • Building costs $16,443,626.21
    • Square footage 90,907 sq. ft.
    • Building costs per square foot $180.88
  • AVERAGE
    • Building costs $14,145,785.71
    • Square footage 91,891 sq. ft.
    • Building costs per square foot $154.21
  • Mr. Linhares stated the actual “soft cost” for the elementary schools analyzed in this presentation include the following:

    • Architectural/Engineering Design Fees
    • Construction Management Fees if applicable
    • Owner Testing/Inspection Fees
    • Furniture and Fixtures
    • Computer/IT
    • Owner Contingencies

    Mr. Linhares referenced a graph showing surrounding countys elementary schools soft costs compared to the average cost.  Mr. Linhares explained the total soft costs for each school.  Mr. Linhares said the average soft costs for all of the elementary schools is $2,978,547.43 and the new elementary school soft costs for Louisa County is $4,008,757.00.

    Mr. Linhares referenced a graph showing the elementary schools soft square foot costs.  Mr. Linhares explained the total soft costs per square foot for each school.  Mr. Linhares stated the average soft costs are $32.68 and Louisa Countys cost is $44.54 per square foot.  

    The following is a summary of soft costs for the above information:

  • Loudon County New Arcola Elementary School
    • Soft Costs $3,322,250
    • Soft costs per square foot $36.89
  • Loudon County Sycolin Creek Elementary School
    • Soft costs $3,202,500
    • Soft costs per square foot $40.30
  • Hanover County 08 New Elementary School
    • Soft costs $2,734,906
    • Soft costs per square foot $30.24
  • Prince William County Brightwood Elementary School
    • Soft costs $1,898,000
    • Soft costs per square foot $19.57
  • Loudon County Rosa Lee Elementary School
    • Soft costs $3,612,500
    • Soft costs per square foot $40.12
  • Spotsylvania County Massaponax Elementary School
    • Soft costs $2,394,676
    • Soft costs per square foot $25.23
  • Caroline County Ladysmith Elementary School
    • Soft costs $3,685,000
    • Soft costs per square foot $36.38
  • Louisa County New Elementary School
    • Soft costs $4,008,757
    • Soft costs per square foot $44.54
  • AVERAGE
    • Soft costs $2,978,547.43
    • Soft costs per square foot $32.68
  • Mr. Linhares referenced a graph for the maximum student capacity and total projected costs.  Mr. Linhares added these are the maximum operating capacities for the Virginia Department of Education.  Mr. Linhares explained the student capacity and total projected costs for each school.  Mr. Linhares said the average student capacity is 951 students at a projected total cost of $20,445,546.71 and the student capacity for Louisa County is 885 students at a projected total cost of $24,376,272.00.  

    The following is a summary of maximum student capacity and total projected costs for the above information:

  • Loudon County New Arcola Elementary School
    • Student capacity 973
    • Total projected cost $19,011,250
  • Loudon County Sycolin Creek Elementary School
    • Student capacity 873
    • Total projected cost $19,862,500
  • Hanover County 08 New Elementary School
    • Student capacity 936
    • Total projected cost $19,906,906
  • Prince William County Brightwood Elementary School
    • Student capacity 972
    • Total projected cost $19,913,045
  • Loudon County Rosa Lee Elementary School
    • Student capacity 973
    • Total projected cost $20,962,500
  • Spotsylvania County Massaponax Elementary School
    • Student capacity 900
    • Total projected cost $21,474,676
  • Caroline County Ladysmith Elementary School
    • Student capacity 1028
    • Total projected cost $21,987,950
  • Louisa County New Elementary School
    • Student capacity 885
    • Total projected cost $24,376,272
  • AVERAGE
    • Student capacity 951
    • Total projected cost $20,445,546.71
  • Mr. Linhares referenced a chart for the summary of the most reasonable costs.  Mr. Linhares said the average reasonably project costs for an elementary school should be in the $20.2 or $20.3 million range.  Mr. Linhares stated the total projected cost for the new elementary school in Louisa County is $24, 376, 284.00.  Mr. Linhares noted the cost savings would be about $4.1 million.  Mr. Linhares stated that does not take into consideration all cost spent up to date, except for the site.  

    Mr. Purcell stated this was an excellent presentation but he has to assimilate this information before commenting further.

    Mr. Harper said Mr. Linhares stated Spotsylvania County did not use a construction manager and questioned if they have a full-time project manager.  Mr. Linhares stated Spotsylvania County does have a full-time staff project manager and staff costs were not included in the comparison graphs.  

    Mr. Linhares stated this presentation basically shows where the costs were since September of 2006 and where Louisa stands.  Mr. Linhares stated this is the information the School Board asked the Board of Supervisors to make the decision on.

    Mr. Havasy questioned how much it costs per year for a school district to keep a construction manager on staff.  Mr. Linhares said in his summary for reasonable costs, architectural administration costs about $100,000.   Mr. Linhares stated basically what can be done is to have a clerk of the works hired by the school, which is about $70,000 per year, and an architect, who is basically a representative for the general contractor working on the project.  Mr. Linhares said the architect would take care of all the change orders that come in and correspondence that happened during the job.  Mr. Linhares added the clerk of the work would oversee and report to the School Board of what is going on.  

    Mr. Lintecum thanked Mr. Linhares and Amanda Lloyd, Office Manager of Administration, for all of their hard work on this presentation.

    Mr. Jennings questioned the structure of the schools.  Mr. Linhares stated the schools were all made of brick and block.  

    Mr. Gentry stated the numbers given are based on the pod design and questioned if Mr. Linhares has looked at any other designs for Louisa to see if the amount of the school would decrease.  Mr. Linhares stated the summary given in the presentation is not specifically based on a pod design.  Mr. Gentry questioned how Mr. Linhares came up with the total projected cost of $20,268,500.00.  Mr. Linhares stated that figure is based on averages and square footage.  

    Mr. Havasy questioned if all of the schools investigated were two stories.  Mr. Linhares stated some were one story and some were two stories.  

    Mr. Linhares said he would like to assure the Board that all of these cost have been verified and are accurate through many conversations with architects and all of the Counties, as well.  

    Mr. Wright questioned if all of the schools included a gym and a cafeteria.  Mr. Linhares all schools in this presentation included a gym and cafeteria.
     

    Mr. Purcell stated he feels like everyone on both, the School Board and the Board of Supervisors, is extremely pro-school, pro-children and pro-construction of the new elementary school.  Mr. Purcell stated from his conversations with the public, they are well aware of this fact.

    Mr. Purcell said the latest statement from the School Board that the discussions of the Design Committee were not relayed properly by this Boards representatives is patently false.  Mr. Purcell added in the Design Committee meeting minutes, it is stated several times that the budget which was agreed to for this project was $16 million.  Mr. Purcell further added the Architect and the Superintendent reiterated the point.  Mr. Purcell said the Board reiterated these points when the discussion on the design was losing site of that fact, at which point the two Boards had a disagreement on price.

    Mr. Purcell said the Board has been placed in the proverbial “no-win” situation.  Mr. Purcell added if the Board approves $25 million for this school, an amount that is fifty percent over budget, the Board will be crucified.  Mr. Purcell further added the reaction to spending $21 million for a 400-person school and multiple trailers becomes even worse.  Mr. Purcell stated each of these options is unacceptable.

    Mr. Purcell said at the same time, what is equally unacceptable, is building no school at all because it is his fundamental belief that everyone on both Boards values the education of young people so the two Boards must find a way to get this done.  Mr. Purcell said the business side of this issue is left, taking into account that both Boards agree how important this is.  

    Mr. Purcell noted at the last Board meeting, the Board was told that mistakes have been made and stated before navigating these troubled waters, he would like to know exactly what mistakes have been made.  Mr. Purcell said knowing what these mistakes were will help determine a course of action.  Mr. Purcell further stated he wants to know what these mistakes have cost in relation to being over-budget on this project by fifty percent so that they dont happen again.

    Mr. Purcell said as he gets the answers to these questions, he would be able to move forward with appropriating funds for the construction of the new elementary school.  

    Mr. Havasy stated he agrees with Mr. Purcell and said the Boards part in building a school is purely financial.  Mr. Havasy added the School Board is in charge of the construction and teaching the children and he doesnt want to interfere with that.  Mr. Havasy said he is very interested in getting a school built, but not for this amount of money.  Mr. Havasy further said he couldnt support spending $4 million more dollars than what is needed.

    Mr. Harper thanked Mr. Linhares for the detailed presentation and stated he is pleased with Mr. Linhares figures for the new school.


    Mr. Jennings said he thinks the two Boards need to realize what has happened so that it doesnt happen again and stated the allowance for the project was known and questioned where the project got off budget.  Mr. Jennings stated the Boards are committed to the Citizens because the project is being built from the taxpayers money.  Mr. Jennings said the final decision would have to be made jointly with the School Board, not just by the Board of Supervisors.  Mr. Jennings said he does realize inflation because the $16 million was awarded over a year ago, but it seems this figure it is workable.  Mr. Jennings further said if the Boards can work within the averages, the project could be in budget.  Mr. Jennings added the two Boards might have to meet again to work this out.  

    Mr. Gentry said January 3, 2006, the Board took a position and said the budget for the school is $16 million and the School Board could come back to the Board of Supervisors with anything justified over the $16 million.  Mr. Gentry added that the School Board submitted no justifications to the Board of Supervisors.  Mr. Gentry stated he doesnt think the Board of Supervisors or Citizens would want to spend $24 million on a school to accommodate 700 students.  Mr. Gentry said spending $21.37 million for 400 students and fifteen trailers is even worse.  Mr. Gentry stated none of the numbers in the presentation reflect that the number of students the school accommodates have to be reduced.  Mr. Gentry said he needs to study the numbers from the presentation to decide where the break down is between the Countys school and the other schools.  Mr. Gentry stated if $24 million and $21.37 million are the only two options, then the Boards still has work to do.

    Mr. Purcell stated according to the presentation, the average cost for the total project is $20.4 million and questioned Mr. Linhares, in his opinion, if the County could build a school for average cost, would he do it.  Mr. Linhares said yes, he would build the school.  

    Mr. Wright stated he would like to recognize the members present from the School Board and stated he apologizes for not recognizing them at the beginning of the meeting.

    Mr. Wright stated $24 million doesnt reflect the total amount of costs because when this money is financed, it isnt interest free.  Mr. McLeod said for $16 million adding interest would increase the total amount to $25 million.  Mr. McLeod added for $24 million plus interest would increase the total cost to $35 million.  Mr. Wright said the public is interested in the total payback figures.  

    Mr. Wright said the School Board needs to know what the Board of Supervisors decision is.  Mr. Wright commented that he doesnt agree with deleting the pod because the school will be over filled the day it opens.  Mr. Wright noted the School Board needs to know what to do by March 10, since that is that last day the current bids are valid.

    Mr. Purcell said the construction of this project needs to be started as soon as possible, but he needs more time to decipher this information presented today by Mr. Linhares.  

    Mr. Havasy said the biggest shocking figure is the total payback and looking at a $10 million extra over twenty years, is $10 million the Board doesnt have to work with.  Mr. Havasy said the Board agreed to appropriate $16 million and once costs started going out of the $16 million class, the School Board should have to come to the Board of Supervisors with problems or what needed to be done differently.  Mr. Havasy said $24 million is a lot of money for the County to absorb and lose.  Mr. Havasy added he wants the school to be built, but he cannot support the current figures.

    Mr. Harper said a year ago the Board appropriated $16 million plus the site work and that puts the figures close to what is being talked about now.  Mr. Harper stated he could entertain supporting the numbers that Mr. Linhares has presented.  Mr. Harper said he cares about how much the school will cost, the number of students the school will accommodate and that the County will own the plans; he doesnt care about the design of the building.

    Mr. Jennings said he thinks the Board should stay with the numbers that were originally appropriated.  Mr. Jennings further said without rushing this project, he thinks the school can be built closer to reasonable numbers.  

    Mr. Gentry said it is difficult to compare figures because Louisas soft costs are $2 million over average and the amount of students the school can accommodate is below average.  Mr. Gentry added he doesnt care about the design of the school, but he cares about how many students it will accommodate.  Mr. Gentry said Spotsylvania Countys bids came in over budget, so they worked on value engineering and considered redesigning.  Mr. Gentry stated he is not in position to go forward with either option that the School Board is presenting.  

    Mr. Wright said the School Board needs to know whether the Board will go with the current figures or not.

    Mr. Purcell stated there is only been one resolution that has been formally approved by the Board, which was appropriating $16 million.  Mr. Purcell said the Board would be voting on approving either option presented by the School Board.  Mr. Purcell questioned if the Board would be making a motion on the amount of money to appropriate to the School Board.  Mr. Wright said the Board is not in the position to offer a specific amount of money.  

    Mr. Gentry stated in January 2006, the Board of Supervisors agreed to commit to the $16 million for the school construction, site improvements, A&E Fees, Value Engineering, construction management, and furniture and fixtures for the new elementary school, which are contingent upon the school being a two story construction with a gym and all state required facilities, student capacity of 700 students, a detailed report from the Construction Manager reflecting all savings, reviewed and approved plans from the Community Development Department, retaining ownership of the plans and the rights of their use, limited construction of the outdoor athletic facilities, and detailed justification and approval by the Board of Supervisors for any costs exceeding $16 million.  Mr. Gentry said this is the only action that the Board of Supervisors has taken for this project.  

    Mr. Purcell said he recommends denying both of the options presented by the School Board, which is for $24 million and $21.37 million with fifteen trailers and 400 students.


    Mr. Gentry stated the School Board voted to send the Board of Supervisors a written proposal for the second option of $21.37 million, fifteen trailers and 400 students and questioned if the Board of Supervisors has received the letter.  Mr. Lintecum stated every Board member received a copy.  

    Mr. Purcell said he would like to make the motion to deny appropriating $24,376,284.88 to the School Board for the construction of the new elementary school.  Mr. Havasy seconded the motion.  Mr. Wright requested a roll call vote.

    PRESENTVOTE
    Fitzgerald A. Barnes Absent
    Willie L. Gentry, Jr. Yes
    Willie L. Harper Yes
    Richad A. Havasy Yes
    Allen B. Jennings Yes
    Eric F. Purcell Yes
    Jack T. Wright Yes

    With the votes reflecting 6-0, with Mr. Barnes absent, the motion passed to deny appropriating $24,376,284.88 to the School Board for the construction of the new elementary school.

    Mr. Gentry said the second option to eliminate one pod for $21.37 million and add fifteen trailers should have a motion as well, because it has also been presented to the Board of Supervisors.  

    Mr. Harper said he would rather the Board not discuss anything in the nature of options.  Mr. Harper stated he would rather the Board say what will be done and what exactly there is to work with.  Mr. Harper added in the future, he would like to get away from “options” in discussions.  Mr. Purcell and Mr. Havasy agreed.  Mr. Wright agreed and stated eliminating a pod and adding trailers isnt an option and that is why the County wants to build a new school.  Mr. Gentry questioned if this isnt an option, then what is it.  Mr. Harper said it depends on whether the Board wants to debate or not.

    Mr. Gentry said he would like to make the motion to deny appropriating $21.37 million to the School Board for the construction of the new elementary school.  Mr. Jennings seconded the motion.  Mr. Wright requested a roll call vote.

    PRESENTVOTE
    Willie L. Harper Yes
    Richad A. Havasy Yes
    Allen B. Jennings Yes
    Eric F. Purcell Yes
    Jack T. Wright Yes
    Fitzgerald A. Barnes Absent
    Willie L. Gentry, Jr. Yes

    With the votes reflecting 6-0, with Mr. Barnes absent, the motion passed to deny appropriating $21.37 million to the School Board for the construction of the new elementary school.  

    Mr. Purcell said when the Board comes back with a suggestion for the School Board, as far as a new resolution, he is not interested in micro-managing that.  Mr. Purcell added he would like more than 400 person school, but he is not interested in micro managing beyond that point.  

    Mr. Havasy commented the Board wants to pursue this project as soon as possible because there is a need for a new school in the Community.  Mr. Havasy stated he would like to pledge his help to expedite this project.  

    Mr. Gentry said he thinks the Board has legitimate numbers to work with between $16 million and $20 million, given what Mr. Linhares presented.  

    Mr. Harper said looking at all project costs, figures are at $19 million for building and site costs.  

    Mr. Wright questioned the Board if they feel like it will be enough time given to discuss this on March 14, 2007 at the budget meeting.  The Board agreed to discuss this at the March 14, 2007 meeting.

    Mr. Wright questioned the Board if there should be a set time limit for the citizens information period during the regular meeting.  The Board stated that was up to the Chairman to decide.  Mr. Wright said the citizens information period would be limited to forty-five minutes.  

    ADJOURNMENT

    On motion of Mr. Jennings, seconded by Mr. Gentry, which carried by a vote of 7-0, the Board voted to adjourn the March 5, 2007 meeting at 4:08 p.m.